My department sectors a structure in the following manner:
Exterior sides being 1-4 or referred to as "Exposure 1-4(1=command side, 2=left side facing, 3=rear, 4=right side facing.
We take it a step further and sector the interior like this:
A=left front corner
B=left rear corner
C=right rear corner
D=right front corner
E= center of structure
Sector A/2= left front corner of 2nd floor
Now, NIMS/ICS and others label a structure as A-D. A=1 (above), etc.
What do you do?
Exterior sides being 1-4 or referred to as "Exposure 1-4(1=command side, 2=left side facing, 3=rear, 4=right side facing.
We take it a step further and sector the interior like this:
A=left front corner
B=left rear corner
C=right rear corner
D=right front corner
E= center of structure
Sector A/2= left front corner of 2nd floor
Now, NIMS/ICS and others label a structure as A-D. A=1 (above), etc.
What do you do?
Comment