I fully admit I am a bit anal when it comes to rigging operations and how they're done.I came across this pic and I wanted to throw it out there to see if anyone else has the same or a similar thought process on rigging for a vertical operation. This question and pic pertain to a confined space entry. I'm not going to say what I think is wrong with this pic...that would be a spoiler, I'm going to wait until there are a few posts.
I'm not saying this pic is necessarily wrong...I love the redundancy in the actual anchor system it's the rigging that I'm having problems with. I'm throwing this out to you because I know there are some great rope guys in this forum and I'd love your two cents.
Mike Donahue
[IMG]
Uploaded with ImageShack.us[/IMG]
I'm not saying this pic is necessarily wrong...I love the redundancy in the actual anchor system it's the rigging that I'm having problems with. I'm throwing this out to you because I know there are some great rope guys in this forum and I'd love your two cents.
Mike Donahue
[IMG]

Uploaded with ImageShack.us[/IMG]
Comment